January 4, 2024
IMAGES showing the technical drawing and area affected for a temporary pipeline bridge to be built over Grand Bahamian Way for about eight weeks. The road will be closed during installation.
Stories this photo appears in:
Pipeline bridge install to cause road closures in Grand Bahama
THE Ministry of Works and Family Island Affairs advises the public that a pipeline bridge will be installed over Grand Bahamian Way for about eight weeks.
Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
OpenID